Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
| Date |
Description |
Inspector |
Results |
Comments |
| 07/24/2020 |
TDOT-Routine Barricade Inspect |
|
Approved |
Waterline repaired. Backfilled with ABC. Roadway repaired. During construction barricades were set up for 1 lane used in east bound Speedway. Striping replaced. By-pass piping removed and site cleaned up. Closed. |
| 07/08/2020 |
TDOT-Routine Barricade Inspect |
|
Continued |
No concerns. |
| 07/05/2020 |
TDOT-Routine Barricade Inspect |
|
Continued |
Called at 220pm by contractor about water main break. Checked lane closures at 715pm. No immediate concerns. |