Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2020 | TDOT-Routine Barricade Inspect | Approved | Traffic devices no longer on site. | |
| 07/01/2020 | TDOT-Routine Barricade Inspect | Approved | 11:30am lane closures up and no work. Called contractor for takedown. 2:00PM elements down. |
|
| 06/30/2020 | TDOT-Routine Barricade Inspect | Continued | Stopped at after hours closure. Double lane closure still up on east bound Golflinks. Spoke with KE&G foreman in the morning to assure takedown to two lanes by 3:30PM. Still up at 4:10PM. Called Rob Zedaker at KE&G and instructed that lane closure needs taken down immediately. Assisted contractor with takedown. |