Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/06/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Sinkhole in shoulder has been corrected. Completed. Closed. |
| 07/31/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Aerial work completed. Crossed Speedway and placed 2 potholes that have been repaired. Pull box in dirt shoulder between sidewalk and curb needs to be raised and sink hole filled. Contractor to complete work by 08/03/20 per contractor. |