Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Walked entire site. Water line installed. Temp. bypass removed. Site partly graded. Asphalt patches in all affected drives. No concrete repair/replacement performed. Compiled extensive punchlist. |
| 09/08/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Some drives asphalt repaired. Shoulder being graded. Barricades gone. |
| 09/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Crew removing the temporary bypass in dirt shoulder. |
| 08/27/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Talked with contractor - got complaint about blocking access at church. They got permission from Pastor to go ahead and cross the drive. Was closed for about an hour. Saw no vehicles trying to enter. |
| 08/19/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor still working in dirt shoulder. Called contractor - Expired permit must renew. |
| 08/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor working in dirt shoulder. Temp. by-pass line being used. Cold patches at drives where temp. lines crosses. |
| 06/12/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Trees cut down to stumps, Vegatation cleared, barricades on shoulder. |
| 05/27/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at site. Most work will be in dirt shoulder with no excavation in main roadway. Supervisor: Bill at 603-7476. Potholing started today. Will clean up shoulder when completed in each area. |