Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T20RW02569
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Continued
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | LAST PIECE OF SIDEWALK SUBGRADE ON CRAYCROFT IS GOOD TO POUR CONCRETE SIDEWALK IN LITTLETOWN DRIVEWAY MEETS SPEC |
|
| 08/21/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Observed concrete forms for ramps on Craycroft, and header curb were all in general compliance with City of Tucson specifications. Ramps will be poured next week. | |
| 08/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | subgrade for sidewalk and ramps on littletown rd meet depth and compaction | |
| 08/11/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | depressed curb for sidewalk on northside of driveway on craycroft needs removed an replaced. sidewalk area on littletown driveway is out of spec. they will be cutting that out and replacing with concrete | |
| 08/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | sidewalk they poured yesterday is in spec. i made a field adjustment at the transition in the header curb. i moved it back to line up. they will repair a bad piece of asphalt while they have the paver onsite traffic control is ok | |
| 08/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS OK POURING SIDEWALK WITH CURB. EXPANSION MATERIAL HAS BEEN INSTALLED, SUBGRADE FOR RAMP IS GOOD. IT HAS BEEN FORMED SEPRATLY FROM CURB RAMP WILL NOT BE POURED TODAY | |
| 07/31/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspected concrete forms for curb. Subgrade was dense, and clean. Proper depth was achieved. Concrete will be place on Monday. | |
| 07/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | All concrete forms were with City of Tolerance specifications (Under 2%). ABC material was compacted with use of jumping jack, ABC was firm. Proper depth of 4" was achieved. Concrete to be poured on 7-8-2020. | |
| 06/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | WAITING ON PLAN REVISIONS | |
| 05/26/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS OK SHOULDER CLOSURE CALLED TOM WEST END OF SIDEWALK LOOKED LIKE IT WAS GOING TO BE FLOODED WHEN IT RAINED | |
| 05/26/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET WITH TOM AND CONTRACTOR ABOUT SIDEWALK. CONTRACTOR WILL TALK TO ZELIN ABOUT ADDING A SCUPPER AND MAYBE A DRAINAGE SWALE TO CONTROL RUN OFF |