Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T20RW02520
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | 4032/4034 Demo completed. Gravel spread. All debri hauled off. | |
09/15/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4032/4034 site - Graded and ready for gravel placement. Gravel in piles on site. Removing the fence/trash located behind building area. | |
09/15/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | All debri removed from El Molinto site. | |
09/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4032/4034 site - Sewer line located and plugged. | |
09/09/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | No additional work performed. | |
09/08/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4032/4034 site - Building gone. Slab removed. Pile of concrete stock piled for removal. Need to fill in at slab area. | |
09/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4032/4034 site - all wood debri removed from site. | |
09/02/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Demolishion started. at 4032/4034. Walk thru with contractor prior to start. Nothing found. Watched the demo on and off all day. Building down by 1 pm. | |
09/01/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | No sign of work at 4032/4034. | |
08/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | No sign of work at 4034 E. Grant Rd. | |
08/25/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Permit reopened by downtown. No sign of work at 4034 E. Grant Rd. | |
06/09/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4026 E Grant Rd.- Site has final grade done. Equipment removed. | |
05/28/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Demo site. Equipment ready for haul off. Fence taken down. Site filled. Gravel spread. | |
05/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Took photos of sewer line plug and excavation where septic tank was removed. | |
05/21/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Pulling up slabs and loading debri. Front screen wall removed. | |
05/18/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | All floor tile removed from south west building by SHC. Loading debri and hauling off. | |
05/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Walk thru 06:40 - all buildings empty. Waiting on operator. Plan is to take down the back 2 buildings today and leave front building for tomorrow. All informed that no building walls could be left standing if demo started. | |
05/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Temp. fence erected. Crew working by hand to remove misc. metals. Equipment on site. | |
05/07/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Southwest Enviro on site - Asbestos removal. |