Permit: T20RW02294

Parcel: 12507599A


Addresses:

330 N CAMPBELL AV

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
10/02/2020 TDOT-EXCAV GENERAL INSPECTION Approved Approved - Work complete. Asphalt patches and concrete restoration on Campbell Ave complete. No further concerns.
09/25/2020 TDOT-EXCAV GENERAL INSPECTION Continued Continued - Team Fishel and Alpha Underground on site performing restoration on assets damaged by utility potholing.
09/10/2020 TDOT-EXCAV GENERAL INSPECTION Continued Continued - Plumber on site to scope HCS to determine if hit by bore.
09/09/2020 TDOT-EXCAV GENERAL INSPECTION Continued Excavation-General (Continued) - Met Plumber and Team Fishel. Plumber Jetted and camera snaked pipe. Fond root damage, gravel, and paper towel wads in HCS. Will return tomorrow to install clean out and re clean and re camera pipe.
09/08/2020 TDOT-EXCAV GENERAL INSPECTION Continued Correction Required - Meeting with Property owner and Team Fishel to discuss ongoing sewer issues in location of CTL bore path. Fishel will have subcontractor camera the line ASAP.
09/04/2020 TDOT-EXCAV GENERAL INSPECTION Continued Continued - Temp patches in Campbell roadway and in sidewalk at SWF.