Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T20RW02292
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2020 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | Correction Required - Conduit installation complete. Asphalt patch at CTL manhole on Warren and 7th remains in reject status. | |
09/25/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Correction Required - meeting to discuss removal and replacement of patch at CenturyLink manhole, Warren Av and 6th. Alpha Underground will remove and replace for Team Fishel next week. | |
09/01/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Continued - Achen Gardner repaired Sewer main hit by Fishel subcontractor bore. | |
08/31/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Continued - Investigated possible sewer damage caused by bore across Campbell. After discussing with Pima County and Team Fishel, appears that 8” sewer was damaged by bore shot. In northbound Campbell just south of 6th St | |
08/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Correction Required - Paving around new CTL manhole does not meet standard specifications. Fishel will provide plan to address. |