Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T20RW02194

Parcel: Unknown


Addresses:

4904 E BAKER ST


Inspection Status: Passed

Inspection History: TRSP - ROW - Recurring

Permit Number - T20RW02194

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Passed

Date Description Inspector Results Comments
06/08/2021 TRSP - ROW - Recurring Passed TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
04/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Barricades are still in place in dirt alley waiting on TEP to perform their work at the pole.
04/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Barricades needed at power pole at open trench. Barricades will also be needed to repair potholes in street Crossing.
06/08/2021 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - All work complete, no concerns. Roadway has been permanently patched and no damage to curb. Pole and meterbox installed. Century link and communication pullboxes have been installed behind pole at existing grade level and electric pullbox next to new pole. No light on pole. Area of work has been cleaned when sight was completed but has little debree of branches and weeds are growing behind curb.
02/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued
04/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Tower installation completed. All work performed in dirt shoulder. Roadwork at tower area not affected. No sidewalk in area. Dirt shoulder restored to original condition. Power run from pole side to junction box near power pole has been completed. The section that TEP needs to install has not been completed. No conductors have been pulled through the conduit. No meter set.
01/25/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - All equipment installed. All work performed and dirt shoulder. No existing sidewalks. Roadway not affected.
02/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Pole set. All boxes set. All work performed in dirt shoulder. Roadway not affected. No sidewalk in area. Site needs to be graded. Electric run completed to power pole. Waiting on TEP to inspect sweep. No meter set.
12/24/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - New pole installed. All boxes installed. All work performed in dirt shoulder. Site graded. Electric conduit for power source run to TEP Pole. Backfilling at sweep at Pole still required. Cold Patch in Roadway.
12/24/2020 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued
11/09/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No blue state. No layout. No sign of work.
11/09/2020 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection