Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Fiber Optic install by Better Way Contracting for First Digital Telecom. Perm Patch in centerlane. Lansdcape rock replaced.FInal. No Issues. |
| 04/20/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon. Installation of fiber - trench in dirt 75 ft, trench asphalt 21 ft, bore 47 ft, overlash aerial fiber 225 ft for first digital telecom conduit. |