Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO RECENT WORK VISABLE | |
| 05/11/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | COMPLETE NO ISSUES WITH ENTRANCE AT THIS TIME |
|
| 05/08/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | SUBGRADE GOOD TO PAVE PAVING THE ROAD INTO THE SUBSTATION |
|
| 04/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | NOT WORKING CURB HAS BEEN FORMED |
|
| 04/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET CONTRACTOR ON SITE. EXCAVATING FOR FOOTER CURBS AROUND DRIVEWAY. THEY NEEDED TO GET WATER TRAILER AND JUMPING JACK TO COMPACT THE SUBGRADE BEFORE THEY SET FORMS. VERY LOOSE SOIL BEFORE COMPACTION. WILL BE EXCAVATING DRIVEWAY SOON |