Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T20RW01851
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Enertech removing pole and preparing to remove caisson and vacuum trench for vaults and electric box. TPD onsite at all times for protestors. Pole was removed. | |
11/08/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - TPD arrived onsite. Verizon called for protestors not allowing work. Officers asked protestors to move to west side of Longfellow out of construction zone. Ada wall placed around pole and where vault will go. Temp no parking signs will be left out. All pre warning work zone signs turned away from roadway. Enertech will be onsite Monday at 0500 for setup and begin removing pole and caisson. Protestors are stationed on south west side of roadway and all vehicles removed from work area per plans and traffic control set up. | |
10/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Enertech tried placing ada wall around site to begin construction and protestors pushed them back not allowing set up for ada wall. Protestors placed chairs in road closure for site to not allow work trucks to get through. No parking signs placed with vehicles on both sides of roadway. Sidewalk closed signs in place for construction area. Traffic control is per approved plans. | |
10/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Protestors on site. Made contact and asked them if they could allow contractor to work per request of Verizon. Refusal to move. Frank from Verizon is making contact with the city. No parking signs placed vehicles on both sides of roadway in road closure | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup. | |
09/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - A verbal stop work order was given to Enertech and Verizon by COT until proper notifications given. School fire department and city communications were notified at 0800. Traffic control was taken down from site and contractor left. Protestors removed temporary no parking signs that were placed by trafficade. Prior inspection shows signs in place. Trafficade placed them back and protestors immediately moved them again. | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
09/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Protestors on site. Verizon on site with Enertech. Awaiting Daniel Robertson to arrive. Temp no parking placed. Work has not proceeded. | |
10/07/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
06/02/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Protestors are on corner with shade structure in place. Temp no parking signs were placed and vehicles are still parked on roadway in between signs. | |
09/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup. | |
06/01/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Protestors on site not allowing work to continue. Blocking street and work area. Dan Robertson on way | |
09/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control is set according to plan. | |
11/15/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole placed and matched to color per Plans. Light placed. Sidewalk and landscaping have been restored. Site passes final ROW inspection. |
|
11/08/2021 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Enertech placed pole and vaults. Sidewalk and landscaping has been restored. Site passes final ROW inspection. | |
10/11/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Enertech completed vacuum trenching. Forming new caisson will place plate over sidewalk with cold patch and ada wall over vault holes. | |
11/15/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
05/25/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre con with Enertech trafficade applying for change of traffic control to road closure on Longfellow. Omit flaggers. Must notify school fire department and waste management if road closure is acceptable. Old pole to be removed this is a shared power site. New pole must match color of existing pole. | |
06/02/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Temp no parking signs in place. |