Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Sidewalks not affected. Roadway repaired at pothole location. Closed. |
| 06/23/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Bore work to new bigshot pedestal completed, no issues. |
| 03/31/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at site. Will be boring across Speedway Blvd. Need to pothole in bus lane for SW GAS and in median for water. Told contractor to replace all landscape as needed and repair roadway including striping. |
| 03/30/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called for a precon to be on Tuesday 3/31/20 at 10 am. |