Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
three areas of sidewalk has been replaced to the nearest joint. all asphalt patching has been completed. No issues or further repairs needed |
| 06/10/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Needs three areas of sidewalk repaired and asphalt patch on Highsmith |
| 05/04/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Underground gas work complete, area needs 1 asphalt patch completed and 3 sidewalk areas repaired. Permit has expired and SW gas notified |