Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/14/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Concrete acceptable. Closed. |
| 03/25/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Concrete poured. forms need to be stripped. |
| 03/20/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called and sent photos of formed apron and compacted subgrade. |
| 03/19/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
At new driveway aprons the existing curb is depressed (not sawcut). Area for apron excavated. Contractor will call when ready for pouring. |