Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/28/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Approved - Punchlist items complete. Final. |
| 06/25/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Lee’s Asphalt continuing to patch smaller areas that Borderland did not pave. |
| 06/10/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
test no inspection. |
| 05/19/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
TC Being pulled down after night work. Excavation just shy of new MH Location in Prince/Oracle intersection. 6:20am |
| 05/08/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Addressed concerns from complaint. Contractor will update MCP |
| 05/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Resetting plates and Traffic Control after night work. OK. |
| 04/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Night work. Arrived at 7:30am and Traffic Control was still up. Border Traffic is on site removing TC. |
| 04/02/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Plates that were bowing and generated a TDOT Concern complaint have been removed and replaced with new plates. Forwarded to Lance. |
| 04/02/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
B&F wrapping up work for the evening. WIll be submitting for traffic control change to allow for daytime work if permitted. Warped plates have been replaced. |
| 03/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
B&F Contracting Inc. will be Installing a temporary bypass system 2 Sanitary Sewer manholes approximately 23 lf of 10'' sewer and approximately 429 lf of 27'' Sanitary Sewer. Precon set for 3/10 at 10am. |