Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/06/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
All cold patches have been replaced. Roadways repaired. Site cleaned up. Closed. |
| 07/22/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Cold patch marked for removal. |
| 06/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
3 of 4 cold patches replaced. Called SW GAS to have last patch replaced. |
| 05/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pipe work completed. Cold patches in roadway. Sidewalk not affected. |
| 05/04/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Cold patches still need replacement. |
| 04/29/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
SW GAS working on site. Cold patch in Elmwood. Working in Whitman (paved alley) against shoulder. Permission given to close alley (Whitman) overnight. 1 time only. |
| 04/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Gas line completed. 2 cold patches in roadway. Sidewalk not affected. |