Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T20RW01358

Parcel: Unknown


Addresses:

913 E IRVINGTON RD


Inspection Status: Passed

Inspection History: TRSP - ROW - Recurring

Permit Number - T20RW01358

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Passed

Date Description Inspector Results Comments
02/14/2022 TRSP - ROW - Recurring Passed TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
09/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Pole is up.
02/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/31/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity today.
02/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
08/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
02/09/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Pre-con with Velex Peter Smith, James Flores DEHI, Jeff Williams All American Underground and Luis from TEP. Went over project details.
02/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/06/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued- No activity
01/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
07/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity permit expired 7/27/21
01/27/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
02/14/2022 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - Sidewalk curb and asphalt restored. Landscaping restored. Pole placed and electrical passed by James Flores. Site passes final ROW inspection.
02/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Asphalt restored and sidewalk. Curb restored. Area restored from water line break during bore. Site passes final ROW pending barricade pickup and steeet cleanup.
02/11/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Velex restoring asphalt. Using low volume approved by Dan Robertson.
02/09/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Velex pouring curb with approved concrete. Forms to be pulled today. Asphalt set to be restored Friday.
02/02/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Velex removed 4” material under asphalt and placing AB compaction terror 100% by testing. Formed curb for pour set 2/9/2022. Sidewalk now open. Sam and James deih onsite with contractors. Velex will call when compaction completed and email reports from WTI
01/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Velex preparing to pour sidewalk. Sidewalk subgrade passed compaction. Pour scheduled for 1100. Cemex had a mix up and arrived at 1230. Velex has cure onsite. It is extremely windy. Panels to be 4’. Curb compaction failed this morning and will be retested at 1400. James deih was onsite while they worked on entenna and sidewalk.
01/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
05/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
01/27/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Velex compacted under curb and sidewalk. WTI late and coming for compaction. Will email proctor and compaction results including failing test done yesterday. Concrete for sidewalk restoration set for tomorrow at 1100.
01/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Met with velex and Dan Robertson. Curb and sidewalk to be restored from water line break. Asphalt to be restored. Requiring one point proctor and compaction tests for under curb att 100% and 95% undersidewalk with use of native material.
12/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Traffic control set up on Irvington during holiday restrictions
11/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Call has been installed but work is still being performed south of pole sidewalk panels have been removed
11/12/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Pole is up.
11/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Pole is up.
10/05/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity going on.
09/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Foundation in.
09/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-Foundation poured.
09/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity going on today.
05/11/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued-No activity
12/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Correction Required. Traffic control with set up on Irvington during holiday restrictions quail construction stated that the Velex did some work last night