Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | NPL completed steel main gas line project, midtown feeder. Restoration complete. Final. |
|
| 04/16/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | SWG/NPL Steel line install. SIte check. Needs cleanup. Needs to allow for space to drive down Balboa next to parked vehicles. Spoke to Mario NPL. Made some sawcut line adjustments and went over with Daniel (NPL) | |
| 04/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Will need to recut trench to allow for T-Top per TDOT Standard Trench Details. Spoke with NPL Sawcutter. |