Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/24/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Small concrete repair on driveway and new perm asphalt patch across roadway. No issues |
| 06/10/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Need driveway and asphalt across roadway, new construction |
| 05/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
repairs still needed |
| 04/20/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Area still needs asphalt and concrete repaired |
| 04/07/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Are still needs asphalt and concrete repaired |
| 04/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
small excavation on SW corner of Fair and Fairground for gas repair. No issues or repairs needed. All work completed in dirt area. |
| 04/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
underground work complete area needs a perm patch.Last note was for a different permit |