Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
underground work complete, SW gas had inspector on site through out the project. All excavations were backfilled with slurry material. Asphalt patches have been accepted. Stop sighns have been reinstalled and wheel chair ramp on 19th and 10th has been reinstalled. No issues or repairs needed |