Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/30/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
all sidewalk, curbs and ramps installed per plan. No issues with grades or workmanship. Are still needs a hand rail completed. Permit will be closed and handrail will be approved prior to C of O |
| 03/05/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
sidewalk inspection, failed grade, contractor went and got a jumping jack and reworked area. Also contractor asked if he could make the sidewalk area 6 in. bigger for handrail installation. I told him no problem. went back later to recheck grade |
| 02/21/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon with Mike Runde for new sidewalk and ramps at restored corner of Main and Simpson, no issues. went over plans and any issues. Starting work next week |