Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Work completed, observed no damage to existing asphalt, or sidewalk. |
| 03/12/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Betterway Contracting will be performing Aerial portion of this work today 3/12. Underground will be done 3/13. Property owner has been angry about Contractors presence around the property. |
| 03/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon with Better Way Construction, work start date tentative based on weather this week. |