Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T20RW00847
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | Completed. Roadway bikelane milled. Transission to neaboring property on east side completed. Closed. | |
| 05/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Review transition for new concrete sidewalk to existing raised asphalt parking lot. No esisting concrete sidewalk. | |
| 05/04/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Curb and sidewalk forms in phase 2 | |
| 04/29/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Working in phase II. Existing curb removed. Barricades up. | |
| 03/27/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | OK to pour sidewalk. | |
| 03/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Parking lot and apron paved. Will mill bike lane after phase 2 work (eliminating old curb cut.). | |
| 03/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ramps placed with yellow plates. | |
| 02/28/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Forms and grade checked for handicap ramps. OK to place concrete. | |
| 02/26/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect forms and subgrade for curbs at parking lot entry. Approved for pouring | |
| 02/24/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor called and discussed the compactions testa under curb along speedway. Will do 1 at each section of curb. | |
| 02/14/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | Precon at site. 2 phases. Will also patch asphalt in alley where utilities used cold patch. |