Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/01/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Roadway bikelane milled. Transission to neaboring property on east side completed. Closed. |
| 05/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Review transition for new concrete sidewalk to existing raised asphalt parking lot. No esisting concrete sidewalk. |
| 05/04/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Curb and sidewalk forms in phase 2 |
| 04/29/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Working in phase II. Existing curb removed. Barricades up. |
| 03/27/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
OK to pour sidewalk. |
| 03/17/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Parking lot and apron paved. Will mill bike lane after phase 2 work (eliminating old curb cut.). |
| 03/03/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Ramps placed with yellow plates. |
| 02/28/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Forms and grade checked for handicap ramps. OK to place concrete. |
| 02/26/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Inspect forms and subgrade for curbs at parking lot entry. Approved for pouring |
| 02/24/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called and discussed the compactions testa under curb along speedway. Will do 1 at each section of curb. |
| 02/14/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at site. 2 phases. Will also patch asphalt in alley where utilities used cold patch. |