Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T20RW00727

Parcel: Unknown


Addresses:

951 N BEDFORD DR


Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Permit Number - T20RW00727

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
09/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No signs of work
11/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic elements in place.
08/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No signs of work yet
11/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
07/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No signs of work yet
11/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection - No activity.
11/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
11/03/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No sign of work. No blue state. No layup. Permit expired. Permit closed.
11/17/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
10/30/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No layout. No sign of work. No blue state. Permit expired. Permit closed.
11/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. Feel pre-con no traffic elements in place.
02/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Antenna still needs to be installed onto pole.
01/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Contractor Velex on site installing missing parts into cabinet.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor. Antenna still needs to be installed onto pole. Reflective tape has been installed on two bollards.
01/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by the contractor or subcontractors. Antenna needs to be installed. Ballards have been installed in Alley.
01/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by the contractor or subcontractor.
01/04/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor North star on site setting meter foundation.
10/22/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No blue state. No layout. No sign of work.
11/03/2020 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection
01/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or sub contractors.
12/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
02/28/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
12/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor North star on site in case and conduit in concrete. And installing base pad for cabin.
01/25/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
12/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by the contractor or subcontractors. Subcontractor quail made patches on roadway all looks good.
01/18/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Field meeting with the TEP. North star communications. And Velex.
01/17/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
12/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Velox on site. Installing cabinet on site.
01/12/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
12/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Northstar on site with Quail barricade company repairing patchwork.
01/04/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic elements in place. I’ll work being conducted in Alleyway.
12/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
01/03/2022 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup.
12/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Velex on site installing electrical conduit and running ground rods.
12/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Felix on site with a ditch witch excavating to run electrical conduit to Cabinet.
12/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
09/09/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake.
10/30/2020 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection
11/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Velex on site with use of vac truck pot holing for light pole foundation and cabinet install.
12/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Contractor Velox on site preparing to install cabinet and Pole foundation.
12/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic control plan in place. No activity on site.
11/24/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
12/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor North Star to arrive on site to remove steel plates on roadway. Backfill and install cold patch asphalt.
12/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Northstar on site installing conduit from Alley to Bedford.
12/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - . Continued Subcontractor North star communications on site boring electrical conduit.
12/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic elements in place. No activity on site.
11/17/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued.No activity on site by the contractor subcontractors.
12/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
11/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Feel pre-con with DIHTP at North star trafficking.
12/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
10/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity at this time
11/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
10/04/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Survey has Mark the area where Pole should be
11/29/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
06/15/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake.
10/22/2020 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection