Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
All asphalt repairs completed no issues. Entire parking lot was repaved |
| 02/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
New driveway and sidewalk repaired and replaced.. Precon was on site 2/4/20. Biggest issue was the trash for the apt. I asked Francisco to have it moved due to construction and concrete curing. Also asked to thicken sidewalk area to 8 inches due to concrete trucks driving on it.Area still needs asphalt patch along curb line |