Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/25/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
ADA ramps placed, apron asphalt placed, sidewalks poured. All within specifications. |
| 03/11/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Curbs stripped. Permit not renewed. |
| 03/04/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Told contractor that permit expired and need to renew it. |
| 02/24/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Inspected curb forms. Ready to pour curbs. |
| 02/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Old sidewalk removed. Barricades up. |
| 01/31/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Curb has been sawcut. Bluestaked. |
| 01/29/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Precon at site - Adding driveway access to new housing development. |
| 01/28/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called for a precon at site. Date set for 1/29/20 at 8 am. |