Permit: T20RW00460

Parcel: 122173920

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
04/02/2020 TDOT-EXCAV GENERAL INSPECTION Approved Work Complete. No Issues.
02/19/2020 TDOT-EXCAV GENERAL INSPECTION Continued Visit to check placement of Business Access signs requested by Business owners along. East side of job. Signs are up. Devices will be pulled on Friday after Temp Striping completed.
02/12/2020 TDOT-EXCAV GENERAL INSPECTION Continued Meeting with Hunter Construction to discuss milling limits of Country CLub. Will shift milling limits to south to match milling limits of future patch to be done by Tucson Water contractor. SWG on site sawcutting to expose extra few feet of main. SWG must replace 4' section of main in addition to the gas service that was hit by Hunter. Patch will be done Friday. Mill and overlay will be week of 2/17. Tucson Asphalt is paving subcontractor for Hunter Construction.
02/10/2020 TDOT-EXCAV GENERAL INSPECTION Continued Hunter Contracting installing TW Main hit Gas service on 2/6. Will be submitting TC plan to address work needed to restore service to customer before continuing with main installation. Email sent to PIO and Gloria S.
02/03/2020 TDOT-EXCAV GENERAL INSPECTION Continued Water Line install. High line installed, waiting on BACT. Will be back monday to begin 6" Main Install. Road is under moratorium and will require 2" mill and replace on 50' either direction of edge of trench location. TDOT 2 Mix. Hunter Contracting is working for Tucson Water.