Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
JT 520-247-9506, Sw gas potholing on Calle Santa cruz for repairs, emergency issues. No repairs needed. Roadway will be repaved by the end of next week |
| 01/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
old permit listed above. JT from SW gas 520-247-9506 asked if I could meet on site. Repaving is in process in the area. SW gas needed to pothole area for a emergency. JT asked if they could close the road. I checked with Kenny wells from Sunland 602-619-6885 who is paving the area to see if he had any issues. I also called Suntran and left a message with Bea. The roadway was closed and the pothole will be completed by tomorrow |