Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tucson Asphalt repaires after water line break. Final. No Issues. |