Inspection Status: Re-inspection required
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 02/01/2024 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Re-inspection required |
punch list sent. will complete final inspection once punch list items are completed. |
| 07/02/2024 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Passed |
punch list items complete site passes inspection |
| 07/15/2025 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Re-inspection required |
Punch list items need to be addressed which include two sidewalk panels and RPM’s at water hydrants. |
| 08/18/2025 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Passed |
Re-inspection has been done, and all items have been addressed satisfactorily. |