Inspection Status: Complete (Recurring)
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2021 |
COT - ENGR - Signage Final |
Hthrall |
Approved |
Entered by HTHRALL1 - Per E Newcomb, special inspection required for wall sign mounts due to height off ground. |
| 01/22/2021 |
COT - ENGR - Signage Final |
Hthrall |
Continued |
Entered by HTHRALL1 - Resubmittal received 1/22/2021, without freestanding sign. |
| 11/19/2020 |
COT - ENGR - Signage Final |
HThrall |
Continued |
Entered by HTHRALL1 - RE: sign review
For: wall / monument signs
AT: 141 S Stone (SE corner of Stone / Ochoa)
Sign permit: T20OT00762
Use: Hampton Inn / Home 2 Suites hotel
Date: 11/18/2020
Reviewer: H. Thrall
Codes: Unified Development Code / Sign Standards (UDC 7A), National Electrical Code NEC 600, Tucson-Pima County Outdoor Lighting Code (OLC), International Building Code (IBC) 2018
Sign District: General Business - C-3 zone / s. side of Ochoa outside of Pedestrian district.
1) General:
A) sign area alright for wall signs, provide dimensions and sign area for each on diagrams in decimal feet to match permit application.
B) Add property line frontage dimensions on plan. Property line frontage on Stone is 279.89 x 3 for total sign area, not to exceed 30% coverage of building elevation. Ochoa frontage is 133.42' property line frontage.
C) on site plan, add north arrow, label streets larger, label property lines, add zoning
2) NEC 600 / OLC:
A) Note for each sign, max 4400k color temperature (internal illum)
B) Note the type of lights (assume LED) and color for each sign
C) Show shut off switches for each sign
D) Check the volts, amps, circuits for each sign
E) Add note where breaker panel is for signage shut off
F) Add note for location of time clock (required per OLC Ch. 4)
3) Mounting: / IBC
A) Provide typical side view elevation of wall sign
B) Provide detailed attachment details for each sign
C) Note that the wall signs 71' off ground will need special inspection for mounting - have engineer sign off on form to appoint mounting method and qualified special inspector: https://www.tucsonaz.gov/files/pdsd/forms/Special_inspection_certificate.pdf
D) noted recent update that signs may be moved to southern end of building elevation (still west elevation) ok to do so if desired, sign area is based off sreet frontage.
4) Monument - review is ongoing due to location
A) is in sight visibility triangle off Ochoa and requires relocation
B) is in right of way and once relocated out of SVT, if still in right of way would require a TRE (temporary revocable easement)
C) provide sign area of actual sign cabinet, and for each panel
D) show construction assembly cabinet to frame / base
E) show footer dimensions
F) provide setback off Ochoa once relocated
G) contact staff about sign location and TRE under review now
H) consider "flag mount" sign to raise structure above 6' SVT, pole out of SVT, potential process to reduce stem of SVT to 16' - and meet sign setback based on height and sign type ( Monument or low-profile design allowed.)
I) all standard shut off switch, lighting, timer, 4400k, etc. notes needed
5) Additional review comments may be forthcoming, depending on responses provided. Send revisions to Heather.Thrall@tucsonaz.gov
|
| 09/02/2021 |
COT - ENGR - Signage Final |
Hthrall |
Approved |
Entered by HTHRALL1 - Photos sent of wall sign installations, with labeled circuit breaker panels, timers and shut off with power packs.
Finaling - H. Thrall 09/02/2021 (photos sent 08/26/21) |