Inspection History Details
Inspection Status: Approved
Inspection History: SIGN EXCAVATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2020 | SIGN EXCAVATION | Approved | Approved | |
| 09/09/2020 | SIGN EXCAVATION | Continued | Requires setback inspections for 3 monument signs - 2 on 22nd Street and 1 on Park. Requires footer inspections for both the engineered signs on 22nd Street. (footer diameter / depth) |