Inspection History Details
Inspection Status: Approved
Inspection History: SIGN EXCAVATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2020 | SIGN EXCAVATION | Approved | ||
| 06/15/2020 | SIGN EXCAVATION | Continued | Maintain 1' clear setback from face of drive thru curb to closest edge of support pole. GC or Sign Contractor can pour footer and provide letter the footer was poured to the engineered plans approved. |