Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: FCON – OH Piping & Hydro
Permit Number - T20FC00359
Inspection Description - FCON – OH Piping & Hydro
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2022 | FCON – OH Piping & Hydro | Canceled | Inspection Canceled | |
10/25/2021 | FCON – OH Piping & Hydro | jpeeldavis | Cancelled | Entered by JPEELDA1 - |
10/04/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 26 - Parking garage, level 1, partial approval |
08/09/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 25 - Level 2, Seahawks building |
07/26/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 24 - Level 3, north building Seahawks. partianl approval |
07/08/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 23 - Level 3 Miami |
06/24/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 22 - parking garage level 2 Seahawks & Retail level 1 Miami |
06/21/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 21 - Miami building. 2nd floor |
05/28/2021 | FCON – OH Piping & Hydro | jfordney | Partial Approval | Entered by JFORDNE1 - Inspection 20 North building Floors 4, 5 and attic north of elevator. P2F ensure insulation doesn't obstruct any sprinkler heads |
05/05/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 19 - Vikings & Steelers buildings floors 2 & 3 |
04/07/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 18 - 1st floor, north building, Eagles, Vikings, Steelers. |
03/25/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 17 - Eagles bldg 3rd & 4th floor. Rms 3339 & 3340 bedrooms have dropped ceilings, need to adjust heads. 3rd floor hall in front of stairs, 2 heads too close together. |
03/16/2021 | FCON – OH Piping & Hydro | wmotto1 | Partial Approval | Entered by WMOTTO1 - ohpt 210 psi at the gauge for the horizonal standpipes at the north building. |
03/11/2021 | FCON – OH Piping & Hydro | jfordney | Partial Approval | Entered by JFORDNE1 - Eagle bldg Floor 1 approved south of 3105. (3105 not done) Eagle bldg floor 2 stairwell hallway needs coverage Eagle bldg floor 2 Approved from south side to breezeway |
02/18/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 14 -Broncos Floor 4 & attic space |
02/11/2021 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 13- Broncos Floor 3, Dallas Floor 4/5 |
01/26/2021 | FCON – OH Piping & Hydro | Mross | Partial Approval | Entered by MROSS2 - Inspection 12 - Broncos floor 2, Rm 2231 missing head in hall closet. Rm 2225 living rm head is dripping. Cardinals bldg floor 4/5 - all rooms ok. |
01/19/2021 | FCON – OH Piping & Hydro | Mross | Partial Approval | Entered by MROSS2 - Inspection 11 - Broncos Floor 1, partial 4th floor, 4 more 2 story units, (now have 8 completed) |
01/07/2021 | FCON – OH Piping & Hydro | Mross | Partial Approval | Entered by MROSS2 - Inspection 10 - Dallar bldg Floor 3. Cardinal bldg 4th floor 4 north units |
12/23/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 9 - Dallas bldg, Floor 2, Partial Approval. Room 2216 has small drip in kitchen soffit. |
12/16/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 8 - Dallas bldg, Floor 1 - residential areas South attic (level 5) - room 2417 missing an upright head. |
11/23/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - -Inspection 7 - Cardinals bldg, Floor 3 |
11/19/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - -Inspection 6 - Cardinals bldg, Floor 2 partial approval |
10/28/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Inspection 5 - Cardinals bldg, Floor 1 Partial approval |
10/26/2020 | FCON – OH Piping & Hydro | MRoss | Denied | Entered by MROSS2 - Inspection 4 - Cardinals bldg, 1st floor, leak at fitting in room 2113. |
10/20/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - -Inspection 3 - Green Bay bldg Floor 3 - partial approval |
10/05/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - -Inspection 2 - Green Bay bldg Floor 2 - Partial approval -Veriy sidewall coverage in living space off of kitchen. distance to wall in 20'6". Sidewall on legend is F1Res44 which has a max coverage of 16x20 |
09/28/2020 | FCON – OH Piping & Hydro | MRoss | Partial Approval | Entered by MROSS2 - Instpection 1 - Green Bay bldg Floor 1 - partial approval |