Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Canceled
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2022 |
FCON – OH Piping & Hydro |
|
Canceled |
Inspection Canceled |
| 10/25/2021 |
FCON – OH Piping & Hydro |
jpeeldavis |
Cancelled |
Entered by JPEELDA1 - |
| 10/04/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 26 - Parking garage, level 1, partial approval |
| 08/09/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 25 - Level 2, Seahawks building |
| 07/26/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 24 - Level 3, north building Seahawks. partianl approval |
| 07/08/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 23 - Level 3 Miami |
| 06/24/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 22 - parking garage level 2 Seahawks & Retail level 1 Miami |
| 06/21/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 21 - Miami building. 2nd floor |
| 05/28/2021 |
FCON – OH Piping & Hydro |
jfordney |
Partial Approval |
Entered by JFORDNE1 - Inspection 20
North building Floors 4, 5 and attic north of elevator.
P2F ensure insulation doesn't obstruct any sprinkler heads |
| 05/05/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 19 - Vikings & Steelers buildings floors 2 & 3 |
| 04/07/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 18 - 1st floor, north building, Eagles, Vikings, Steelers. |
| 03/25/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 17 - Eagles bldg 3rd & 4th floor. Rms 3339 & 3340 bedrooms have dropped ceilings, need to adjust heads. 3rd floor hall in front of stairs, 2 heads too close together. |
| 03/16/2021 |
FCON – OH Piping & Hydro |
wmotto1 |
Partial Approval |
Entered by WMOTTO1 - ohpt 210 psi at the gauge for the horizonal standpipes at the north building. |
| 03/11/2021 |
FCON – OH Piping & Hydro |
jfordney |
Partial Approval |
Entered by JFORDNE1 - Eagle bldg Floor 1 approved south of 3105. (3105 not done)
Eagle bldg floor 2 stairwell hallway needs coverage
Eagle bldg floor 2 Approved from south side to breezeway |
| 02/18/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 14 -Broncos Floor 4 & attic space |
| 02/11/2021 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 13- Broncos Floor 3, Dallas Floor 4/5 |
| 01/26/2021 |
FCON – OH Piping & Hydro |
Mross |
Partial Approval |
Entered by MROSS2 - Inspection 12 - Broncos floor 2, Rm 2231 missing head in hall closet. Rm 2225 living rm head is dripping.
Cardinals bldg floor 4/5 - all rooms ok. |
| 01/19/2021 |
FCON – OH Piping & Hydro |
Mross |
Partial Approval |
Entered by MROSS2 - Inspection 11 - Broncos Floor 1, partial
4th floor, 4 more 2 story units, (now have 8 completed) |
| 01/07/2021 |
FCON – OH Piping & Hydro |
Mross |
Partial Approval |
Entered by MROSS2 - Inspection 10 - Dallar bldg Floor 3. Cardinal bldg 4th floor 4 north units |
| 12/23/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 9 - Dallas bldg, Floor 2, Partial Approval.
Room 2216 has small drip in kitchen soffit. |
| 12/16/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 8 - Dallas bldg, Floor 1 - residential areas
South attic (level 5) - room 2417 missing an upright head. |
| 11/23/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - -Inspection 7 - Cardinals bldg, Floor 3 |
| 11/19/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - -Inspection 6 - Cardinals bldg, Floor 2 partial approval |
| 10/28/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Inspection 5 - Cardinals bldg, Floor 1 Partial approval |
| 10/26/2020 |
FCON – OH Piping & Hydro |
MRoss |
Denied |
Entered by MROSS2 - Inspection 4 - Cardinals bldg, 1st floor, leak at fitting in room 2113. |
| 10/20/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - -Inspection 3 - Green Bay bldg Floor 3 - partial approval |
| 10/05/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - -Inspection 2 - Green Bay bldg Floor 2 - Partial approval
-Veriy sidewall coverage in living space off of kitchen. distance to wall in 20'6". Sidewall on legend is F1Res44 which has a max coverage of 16x20 |
| 09/28/2020 |
FCON – OH Piping & Hydro |
MRoss |
Partial Approval |
Entered by MROSS2 - Instpection 1 - Green Bay bldg Floor 1 - partial approval
|