Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 07/20/2020 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | -Underground fire line along east side of property, -still need to inspect fire line east to new stub out near street (new stub out and hydrant yet to be installed) -Need underground test certificate. |
|
| 07/17/2020 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | UG was not resrained with thrustblock where required. Observed 6" fire protection line for south building (120') |