Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2020 | FIRE - ALARM FINAL | Approved | ||
| 07/17/2020 | FIRE - ALARM FINAL | Not ready for Inspection | 1. Tested tamper and flow. Passed 2. Tested all strobes passed. 3. waiting for the elevator portion approval from the state. 4. Panel is reporting checked central station is recieving signals. 5. Need breaker lockouts to be red and labled. |