Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2020 | FIRE - ALARM FINAL | Approved | 1. Tested Building 11 for Water Flow and Tamper. | |
| 06/22/2020 | FIRE - ALARM FINAL | Partial Approval | 1. Tested Building 7 and 8. All signals reported to the FACP and Central Station. | |
| 04/21/2020 | FIRE - ALARM FINAL | Partial Approval | 1. Tested Buildings 1, 2, 4, 5 for Water Flow and Tamper. 2. All signals reported to Panel and Central Station. |