Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2020 | INSP - INITIAL CODE ENFORCMENT | Approved | EMERGENCY CALL BY TFD: THERE IS FIRE DAMAGE TO THE WOOD FRAMED CONSTRUCTION PROJECT REAR OF THE EXISTING BUILDING. THIS WOOD FRAMED 2 STORY BUILDING WAS 99 % DESTROYED BY FIRE. THE EXISTING SIDE AND REAR MASONRY BUILDING HAVE BEEN DESTROYED. PERIMETER INSPECTION OF THE FRONT EXISTING BUILDING HAS HAD THE ROOF ASSEMBLY DESTROYED ELECTRICAL: THE POWER POLE IN THE ALLEY WAS DAMAGED SO THE POWER IS OFF TO THE PROPERTY. PLUMBING: N/A MECHANICAL: N/A REMARKS: AN EMERGENCY ORDER TO DEMOLISHMENT THE REAR WOOD FRAMED WALL WAS ORDERED, THIS FIRE DAMAGED WALL LOCATED IN THE NEW CONSTRUCTION ZONE AND IS DIMENSIONED BY 20 FEET IN HEIGHT BY 60 FEET IN LENGTH. UNABLE TO INSPECT EXISTING BUILDING'S INTERIOR. PERMITS REQUIRED FOR REPAIRS |