Case: T20DV04990

Parcel: 115060080

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T20DV04990

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
11/24/2020 INSP - FOLLOW UP CODE ENFORCE Approved REVISITED SITE, ALL INSULATION AND DRYWALL HAS BEEN COMPLETED. UNIT #1 PAINTED AND READY TO RENT. . UNIT #3 NEEDS ONLY THE TEXTURE COAT OF DRYWALL AND PAINT WHICH IS SCHEDULED FOR FRIDAY 11/27/2020. UNITS REMAIN UNOCCUPIED. C/E HAS NO FURTHER ISSUES DUE TO UNITS NOT BEING OCCUPIED. COMPLIANCE / CLOSE CASE.
11/20/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, INSPECTOR ROBERT GONZALEZ HAD ISSUED A NOV FOR CLEAN UP PURPOSES CONCERNING THE COMPLEX.. THAT WORK WAS COMPLETED. UNIT #3 STILL REQUIRES DRYWALL ON THE CEILING, THE INSULATION REMAINS INSIDE THE UNIT. CONTACTED PROPERTY MANAGER, REQUESTING A COMPLETION DATE, HAD TO LEAVE A MESSAGE.
11/09/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, FOUND EXTERIOR OF THE UNITS CLEANED UP AND THE DUMPSTER AREA CLEAN AS WELL IN BETWEEN THE UNITS WAS CLEANED FREE OF GRASS AND WEEDS. CHECKED UNIT #1 AND FOUND DRYWALL WAS COMPLETED, TEXTURED AND PAINTED, NICE JOB. ALSO FOUND THAT UNIT #3 HAS NOT BEEN COMPLETED ALTHOUGH THE INSULATIONS IS INSIDE THE UNIT. MAYBE READY TO GET STARTED. CONTACTED PROPERTY MANAGER WHO STATED SHE HAS GOTTEN A 2ND NOV FROM INSPECTOR GONZALEZ WHICH IS WHY THE CLEANING OF THE PROPERTY HAS BEEN COMPLETED. I ASKED THAT THE DRYWALL BE COMPLETED SO THAT THE CASE CAN BE CLOSED. MANAGER STATED THEY WOULD GET THAT DONE.
10/23/2020 INSP - FOLLOW UP CODE ENFORCE Approved RECEIVED CALL FROMTHE PROPERTY MANAGER STATING THAT SHE DID MOVE FORWWARD WITH FINDING SOME ONE TO COMPLETE THE DRYWALL AND WILL BEGIN ON 10/24/2020
10/21/2020 INSP - FOLLOW UP CODE ENFORCE Approved REVISITED SITE, DRYWALL STILL NOT COMPLETED BUT WAS REMOVED IN BOTH UNITS 1 & 3 . UNIT REMAIN VACANT. CONTACTED PROPERTY MANAGERS WHO STATED THEY STILL HAVE NOT REPLACED THE MAINTANENECE PEOPLE THEY HAD LET GO AND DID NOT LOOK AT THIS AS A PRIORITY BECAUSE THEY HAD HOUSED BOTH OCCUPANTS AND THEY HAVE RECEIVED NO COMPLAINTS FROM THE OCCUPANTS. PROPERTY MANAGER STATED SHE WOULD TRY TO GET SOME ONE OUT HERE NEXT WEEK AND WOULD CALL AND CONFIRM WHEN WORK IS TO BEGIN
10/05/2020 INSP - FOLLOW UP CODE ENFORCE Approved REVISITED SITE, STILL FOUND NOTHING DONE WITH THE DRYWALL. CONTACTED PROPERTY MANAGERS WHO STATED THEY HAD TO LET TWO LEAD MAINTANENCE GUYS GO. HIRING PROCESS TO REPLACE THEM BUT STATED THE DRYWALL SHOULD BE COMPLETED BY FRIDAY 10/16/2020
10/02/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, FOUND THE ROOFING COMPLETED, THE COOLERS ON ALL OCCUPIED UNITS REPLACED AND WORKING, FACIA REPLACED AND PAINTED. DRYWALL IN UNITS 1 #3 HAS BEEN REMOVED BUT NOT YET REPLACED.
09/25/2020 INSP - FOLLOW UP CODE ENFORCE Approved REVISITED SITE, ROOFING HAS BEEN COMPLETED, FACIA REPLACED AND COMPLETED. COOLERS REPLACED AND RUNNING, 2 UNITS VACANT,DRYWALL HAS BEEN REMOVED FROM THE CEILING IN BOTH VACANT UNITS, DRYWALL NEEDS ONLY TO BE REPLACED, TAPED, TEXTURED AND PAINTED. TRIED CONTACTING SHELLY FOR A COMPLETION UPDATE.
08/31/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, WALKED THE ROOF ROOFERS ARE REPLACING PLYWOOD AND COVERING THE ROOF WITH NEW ROOF COVERING AS THEY GO . DRYWALLERS ARE IN UNIT #3 REMOVING MOLDY DRYWALL., UNIT #1 IS COMPLETED WITH THE REMOVEAL OF DRWALL, #3 IN PROGRESS.
08/26/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, FOUND ABOUT 5O% OF ROOF COVERING REMOVED AND PLYWOOD IN THE PROCESS OF BEING REMOVED AND NEW SHEETS BEING REINSTALLED. ROOF TARPS ARE CLOSE BY IN CASE OF RAIN.
08/25/2020 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITE, FOUND ROOFING CREW ON SITE REMOVING THE ROOF COVERING FOUND 8 20 FT 2X 8 FOR REPLACEMENT OF THE FACIA AND 12-15 SHEETS OF PLYWOOD. SPOKE WITH THE OWNER OF THE COMPANY COPPER RIDGE ROOFING WHO STATED HE CALLED AND TALKED TO CLAYTON T. AFTER RECEIVED AN EMAIL THEY WERE BEHIND ON ISSUING PERMITS, HE READ TO ME THE EMAIL AND THEN STATED HE HAS NOT HAD ANY RESPONSE SINCE EVEN THOUGH HE CONTACTED CLAYTON A 2ND TIME. C/E HAS PUSHED PROPERTY MANAGER TO GET PROJECT STARTED EARLY AND THEY HAVE STARTED ONE WEEK EARLIER THAN EXPECTED. NOW WEARE ASKING TO STOP WORK. MARTIN ASKED IF I COULD CALL CLAYTON AND FIND OUT IF WORK COULD CONTINUE.
I CONTACTED AND SPOKE WITH CLAYTON WHO ASKED IF THIS WAS COPPER RIDGE ROOFING. I TOLD HIM IT WAS, EXPLAINED ALL CIRCUMSTANCES START TO PRESENT AND CLAYTON GAVE THE OK FOR WORKERS TO MOVE FORWARD WITH WORK, BUT ASKED THAT THEY TAKE PICTURES OF EVERYTHING THAT IS COMPLETED BEFORE AND AFTER SO WHEN IT CAME TIME TO ISSUE A PERMITTHERE WOULD BE NO PROBLEMS ISSUING THE PERMIT. THE MESSAGE WAS PASSED ON TO MIKE, SUPERINTENDANTAND JULI0 FOREMAN. MARTIN WAS ALSO CONTACTED AND INFORMED. .
08/11/2020 INSP - FOLLOW UP CODE ENFORCE Approved ON 8/11 I MET WITH 1 OF 3 MANAGERS. NAN STATED THE MANAGER I HAD BEEN WORKING WITH WAS NOT IN BUT SHE COULD HELP ME. GAVE HER MY PAST INFORMATION FOR THE PROPERTY AND EXPLAINED WE WERE ISSUING A NOV TO TRY AND HURRY THE PROCESS ALONG . NOV WAS HAND DELIVERED AND SIIGNED FOR BY NAN B.
LATER IN THE AFTERNOON I RECEIVED A MESSAGE FROM NAN STATING THE ROOFING COMPANY WAS NOT SCHEDULED TO START UNTIL SEPT. 1ST THAT THEY WOULD REACH OUT TO OTHER COMPANIES THAT SUBMITTED BIDS TO SEE IF THEY COULD START SOONER, BUT ONCE THE ROOF WAS COMPLETED, THE INTERIOR DRYWALL AND PAINT WOULD BE REPAIRED.
08/04/2020 INSP - FOLLOW UP CODE ENFORCE Approved I REVISITED THE SITE, AND FOUND THE ROO REMAINED TARPED. I CONTACTED PROPERTY MANAGER AND ASKED WHAT THE STATUS WAS. SHE STATED THEY WERE MEETING WITH THE INSURANCE COMPANY AS WE SPOKE AS IT WAS DECIDED TO PUT A CLAIM IN WITH THE INSURANCE. SHE FELT THAT THE ROOFERS WERE TO BEGIN ON THE FOLLOWING MON - TUES.