Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Interior Shear Bracing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2023 | COT - RSBU - Interior Shear Bracing | Partial Pass | Exterior framing. | |
| 10/16/2023 | COT - RSBU - Interior Shear Bracing | Re-inspection required | 10/16/23: firewall nail scheduling needs to be followed (4" edge and 8" field) | |
| 10/18/2023 | COT - RSBU - Interior Shear Bracing | Re-inspection required | 10/16/23: firewall nail scheduling needs to be followed (4" edge and 8" field) 10/18/23: firewall nail scheduling needs to be followed (4" edge and 8" field) |
|
| 10/24/2023 | COT - RSBU - Interior Shear Bracing | Passed |