Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 7/12/24: not ready | |
| 10/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10-20-25:firefoam all penetrations at top plates, install box and make up wires for range, add straps to all DWV, all pancake boxes must be grounded at time of inspection, backfill behind bathtub in master bathroom using concrete, correct exposed wiring on master bathroom fan, missing greywater-see wast plan on A6 for details and missing hot sole water system-see A6 fore more information. NOTE: At contractor's request only Unit A was inspected. Unit B will be inspected at a later date. |
|
| 10/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 10/21/25 corrections made, partial pass for unit A | |
| 10/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10.29.2025 Unit 2 Lower thermostat to 48" from floor, need 18" of copper at water heater to protect Pex line, plans call for fan w/ light box in master, living room, bedroom two and office (only master has fan box), secure water line behind tub, tub not set in concrete and verify no leak behind tub, firefoam top plate penetration in kitchen area. Ensure outlet receptacles not spaced more than 4' apart at counter top in kitchen area and 2' from edge. |
|
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | All corrections have been completed. 11/4/2025 |