Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2021 | FRAMING | Approved | Approved | |
| 12/17/2021 | FRAMING | Correction Required | CO 1. Fire block at all soffits, and at floor/ceiling in chase and at 2nd level lid |
|
| 11/16/2021 | FRAMING | Correction Required | CO 1. Follow detail 5 for post to beam connection 2. Get new engineering for LSL beam connection to masonry wall 3. 2nd floor sill plate not fastened to floor at 12” on center. |