Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Not Ready | ||
| 02/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Partial Pass | 2/9/24: please change out all untreated wood against concrete, exterior clip and sheathing per plan, ok to proceed. Roofing sheathing nailed per schedule, revision will be needed on new roof extending over existing roof (not per plan), ok to dry-in. Interior columns pending (footings and 6x6 post holdowns). | |
| 07/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/9/24: please change out all untreated wood against concrete, exterior clip and sheathing per plan, ok to proceed. Roofing sheathing nailed per schedule, revision will be needed on new roof extending over existing roof (not per plan), ok to dry-in. Interior columns pending (footings and 6x6 post holdowns). 7/22/24: passed |