Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2022 | ENGINEERING - FINAL | Approved | Approved | |
| 02/18/2022 | ENGINEERING - FINAL | Partial Approval | Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy. For final approval, please complete the requirements of the development package permit and schedule all required inspection codes for all remaining open permits pertaining to this project. Complete the work at the basin overflow area. Complete ground covering installation and remove all dirt and construction debris from accessible sidewalk. |
|
| 02/14/2022 | ENGINEERING - FINAL | Partial Approval | PARTIAL CAN GIVE THEM THE TCO. BUT NEED TO FINISH THE DRAINAGE CHANNEL. | |
| 02/11/2022 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Utility work Northeast portion of site has not been completed. Open hole. Temporary fencing still in place. Development package permit has not been finalized. Complete utility work, backfill clean up and install ground covering. Schedule inspections from DP permit. Provide contact information for inspection | |
| 01/21/2022 | ENGINEERING - FINAL | Partial Approval | PARTIAL, OK FOR TCO STOCKING ONLY NOT FOR OCCUPANCY |