Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2020 | ELECTRIC - FINAL | Approved | 1090 and 2090 are both APPROVED and ready to energize and solar meter Line side tap, DGL Clearance called into TEP at 2:00 |