Inspection History Details
Inspection Status: Canceled
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | RSBU - Building Final | Canceled | Inspection Canceled | |
| 08/26/2025 | RSBU - Building Final | Re-inspection required | 1. Beam is upside down. 2. Replace 2xs that have cut for proper support of beam. 3. Provide proper fasteners from beam to beam. 8/26/2025 |
|
| 08/29/2025 | RSBU - Building Final | Not Ready | ||
| 08/29/2025 | RSBU - Building Final | Re-inspection required | 8-29-25: replace 2x4 with a pressure treated stud. | |
| 09/03/2025 | RSBU - Building Final | Partial Pass | 9/3/25: corrections made ok to proceed. | |
| 09/12/2025 | RSBU - Building Final | Passed | 9/12/25 corrections made |