Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
Permit Number - T20CM07264
Inspection Description - ELECTRIC - UNDERGROUND
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2021 | ELECTRIC - UNDERGROUND | Approved | Approved. Conduits to Buildings #2; 1A, 1B, 3, L5. Ok to cover progress areas. | |
08/12/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Quadrant #4; conduits (2”) and ufers for buildings 1A; 1B; 2; and L5: units #14, 15, 16, 17, 18, 19, 20. Ok to cover progress areas. | |
08/10/2021 | ELECTRIC - UNDERGROUND | Partial Approval | pa Quad 4 - bldg 5 laundry room to bldg 3 ok to backfill |
|
07/08/2021 | ELECTRIC - UNDERGROUND | Partial Approval | pa Conduit ok to backfill from 12B service to #47 |
|
07/07/2021 | ELECTRIC - UNDERGROUND | Partial Approval | pa From 12B to jbox at rec room ok to backfill. |
|
07/02/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Trenching and conduits (6 at 1 1/2” - 2 1/2”) from building 11A to building 12B. Ok to place concrete in sidewalk cuts and cover progress areas. | |
06/30/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Trenching with 2 each 2 1/2” conduits fro Building #12A to Building #12B. Ok to cover progress areas. | |
06/28/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Underground conduits (1 1/2”) from building services 9A-9B; 10-11B; 11A-12B. Ok to cover progress areas. | |
06/24/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial - continue trenching from Building 9A, 9B,10 and 11B, 4 conduits. Okay to backfill this portion. | |
06/23/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Trenching from Building 9B - 10; 10 - 11 with two each 1” conduits. Ok to cover progress areas. | |
06/16/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Conduits (1 1/2”) in trenches for services to Building 7B to Building 8 for Units 28-31; conduits (1 1/2”) for service to Building 9A, Units 33-34. Ok to cover progress areas. | |
06/10/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Conduits from transformer #16 to building #7; Units 29 and 30. Ok to cover progress areas. | |
06/09/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Four each 1 1/2 “ electric conduits from Phase #1 to transformer #16; approximately 125 linear feet. Ok to cover progress areas. | |
06/08/2021 | ELECTRIC - UNDERGROUND | Partial Approval | PARTIAL UNDERGROUND TO BUILDINGS 6A, 6B, 6C, 7A | |
06/04/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial. Quadrant #1; Units #1-6; conduits from existing transformer to new location at 4”-1 1/2 “ conduits. Ok to cover progress areas. | |
05/27/2021 | ELECTRIC - UNDERGROUND | Partial Approval | Partial, underground from Building #4 Units 1,2,3,4,5,6 to pavement, okay to backfill |