Permit: T20CM06822

Parcel: 13608032E


Addresses:

2300 S HOUGHTON RD

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
02/01/2022 EXCAVATION/LAYOUT REBAR & ZON Approved 2010, 1015, 1075, 1005, 1010, 1020. 2035, 1035. 2090, 1090 .
Approved. See permit number T21CM00360.
09/21/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1005, 1010. Partial. Retain wall on East and Northeast corner of building.
04/30/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL - POURING 1ST FLOOR COLUMNS
03/26/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Elevator lift, 20 to 28 feet, top out, with clean outs.
03/25/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Concrete 2nd floor header for elevators.
03/19/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled
03/17/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings at south canopy.
03/16/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled CANCELLED BY CONTRACTOR
03/05/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled CANCELLED BY CONTRACTOR
02/25/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings and foundations, gridlines A4 to H4. Footings at D.1-5 and D.8-5.
02/23/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL FOOTINGS AT GRIDLINES B3 THRU G3
02/22/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL INTERIOR FOOTINGS, GRIDELINES B2 THRU G2
02/19/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL FOOTINGS AND FOUNDATION ON GRIDLINES H-1 THROUGH 4, ELEVATOR PIT WALLS
02/18/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Footings and foundations on Gridline H – 1 through 4.
02/17/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL ELEVATOR PIT, FOOTINGS AND FOUNDATION ON GRIDLINES A1 TO A4
02/16/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled CANCELLED BY CONTRACTOR