Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T20CM06766
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/07/2020 | PLUMBING - FINAL | Approved | Close permit | |
10/22/2020 | PLUMBING - FINAL | Denied | de Temperature- pressure relief valve drain line must be hard piped. Flex pipe cannot be used due to the restricted I.d. Also, the hard drain line must be pitched for drainage, immediately upon exiting the valve, all the way to its termination point. |